All Sympl · Project solutions

Healthcare Facilities

Healthcare construction is regulated. The CPM platform should act like it.

Hospital expansions, ASCs, and clinic networks require ICRA workflow during construction, FGI Guidelines compliance on equipment submittals, and a handover that ties medical equipment data to the operating CMMS. Sympl · Project ships the templates so the paper looks right on day one.

Who it's for

The roles inside the buyer organization.

  • Health system Directors of Construction
  • Owner Project Managers (OPMs) on hospital builds
  • Facilities Directors at health systems
  • Compliance officers and Joint Commission liaisons
  • Medical equipment planners (MEPs)

Project types

The work this serves.

  • Hospital expansions and new patient towers
  • Ambulatory Surgery Centers (ASCs)
  • Imaging and oncology suites
  • Clinic network rollouts
  • Medical office buildings (MOBs)
  • Behavioral health facilities

Highlighted workflows

What this looks like in Sympl · Project.

FGI-aware submittal templates

Templated standards pack (coming soon) includes FGI Guidelines healthcare-equipment submittal templates with Joint Commission EC tagging — so reviewer memos cite the right standard, not a generic spec section.

Infection Control Risk Assessment (ICRA)

ICRA classification, barriers required, and air-balancing data tracked on every construction activity that touches occupied space. Templated workflow coming soon.

Medical equipment commissioning

Submittal data on imaging, surgical, and life-safety equipment materializes into the Sympl · CMMS asset registry with warranty terms, vendor service contracts, and recommended PMs intact.

Owner-side approval workflows

CFO + Compliance review chains on every pay app and change order. Audit log built in, not bolted on.

Today's pain

What we kept hearing.

  • FGI Guideline compliance reviewed manually against PDF submittals; nothing flags non-compliant equipment automatically
  • ICRA workflow lives in a separate compliance tool, not the CPM platform
  • Medical equipment handover to CMMS is a 6–12-month manual data-entry project
  • Joint Commission EC documentation re-keyed from the construction record
  • Multi-stakeholder approvals (CFO, Compliance, Infection Prevention, MEP) on every change order

Standards & defaults

The paper this vertical requires, shipped as defaults.

  • FGI Guidelines (Hospital, Outpatient, Residential Care) — coming soon
  • Joint Commission EC (Environment of Care) tagging on submittals
  • AIA G702/G703 + G706/G707 closeout paper
  • NFPA 99 health-care facilities code references
  • CSI MasterFormat 2020 spec organization
  • COBie + IFC handover for BIM-aware health systems (coming soon)

Why it wins

Healthcare, in one paragraph.

Healthcare construction has the highest compliance bar in the industry and the most consequential handover — if the CMMS doesn't know about the imaging suite's service contract on day one, the hospital is paying twice. Sympl owns both the construction record and the operating CMMS, which means the asset graph is born compliant.