Delaware has 141 active site-work, paving, and drainage projects in SymplSignal, and 44 of them are still ahead of the public bid board: funded or in design, before an RFP posts. Behind them sit 161 public buyers that procure this work across all three counties, led by the water and sewer authorities driving Delaware's stormwater and utility build-out.

What's driving the work

  • Stormwater compliance is a standing construction driver. Delaware municipalities that run storm sewer systems must hold an MS4 permit and a stormwater management program, obligations that convert into drainage, sewer, and site projects on a rolling basis. (DNREC — MS4)
  • The state is financing it. DNREC's Water Pollution Control Revolving Fund lends below market for stormwater infrastructure, and the Clean Water for Delaware Act stood up a Clean Water Trust for drainage and stormwater work. That funding appears in the public record before the bid.
  • MPO transportation plans telegraph the paving. Metropolitan planning organizations publish multi-year Transportation Improvement Programs that name road, sidewalk, and drainage work years before it lets. This dataset already tracks the Dover/Kent County MPO's FY2027–FY2030 TIP at early-signal stage.
  • Utilities are the volume buyer. Water and sewer authorities are the single largest buyer type here; their treatment, pipe, and stormwater projects carry heavy site, paving, and drainage scope.

The buyer landscape

Across Delaware's three counties, SymplSignal tracks 161 public buyers that procure site work, paving, and drainage: water and sewer authorities (50), fire districts (22), public works (16), county government (15), and state agencies (14). Buyer depth is greatest in Sussex (51) and Kent (46).

The pipeline

Of 142 tracked opportunities, 141 are active and 44 are still ahead of the public bid board. The early-stage work concentrates in Kent County (16 ahead), then Sussex (13) and New Castle (5). Activity ramps steeply in mid-2026, with June and July the busiest months on record.

Representative early-stage projects

  • Town of Little Creek: Southern storm sewer improvements & ditch/wetland restoration (design in progress)
  • Roxana Volunteer Fire Company: Station 2 replacement, Route 54 site work + stormwater (funding proposed)
  • Dover/Kent County MPO: FY2027–FY2030 Transportation Improvement Plan (early signal)

These are three of 44. The full pipeline, with owner, stage, and county for every project, lives in SymplSignal.

How contractors use this

Prioritize Kent and Sussex, where the pre-RFP work concentrates; track the water and sewer authorities and the MPO/TIP pipeline; and engage during funding-approved and design, before scope and drainage details lock into an RFP. See how it works for site work, paving & drainage.